Looking toward right abutment from axis station 7+75 showing sump for upper drainage system seen in Pine R - 174.
Cover Image
Format:
Image
Installation of foundation drainage system on upper bench at upstream side of cut-off trench, left abutment.
Cover Image
Format:
Image
Looking toward right abutment in cut-off trench, showing mechanical tamping of embankment over foundation drainage system.
Cover Image
Format:
Image
Looking along center line of cut-off trench toward left abutment from opposite dam axis station 8+00. Note rock excavation for cut-off wall footing in center.
Cover Image
Format:
Image
Concrete cut-off wall on left abutment. Portion of cut-off trench in foreground has been refilled, covering the wall. Refer to Pine R - 160.
Cover Image
Format:
Image
Placing concrete for cut-off wall footings at left abutment.
Cover Image
Format:
Image
Looking toward left abutment from axis station 7+75 showing in foreground the installation of foundation drainage system at upstream side of cutoff trench. This installation is on the bench shown in upper left hand corner of Pine R - 157.
Cover Image
Format:
Image
Same view as Pine R - 158 after approximately 30 feet of embankment has been placed. Note grout risers and top of c.m.p. sump.
Cover Image
Format:
Image
Looking toward right abutment from axis sta. 7+75. Le Tourneaus are seen excavating additional cut-off trench in center of picture, and placing the material directly into the fill in the old river channel in the foreground.
Cover Image
Format:
Image
Excavating additional cut-off trench. Looking toward left abutment from axis at sta. 20+00. Refer to Pine R - 167 and 171.
Cover Image
Format:
Image
Looking toward left abutment from sta. 20+00. Additional cut-off trench excavation in foreground. Refer to Pine R - 167.
Cover Image
Format:
Image
Embankment placing in old river channel, where operations are being concentrated at present. The No. 3 section is seen in foreground grading into the downstream No. 2 section near rock-rake and trucks.
Cover Image
Format:
Image
Placing embankment in additional cut-off trench. Looking toward right abutment from axis sta. 16+25. Refer to Pine R - 188 and 195.
Cover Image
Format:
Image
Inlet channel to outlet conduit, looking downstream. Structure seen in center is the concrete mixing plant.
Cover Image
Format:
Image
Excavating in bedrock at upstream right hand corner of trashrack structure.
Cover Image
Format:
Image
Excavating rock for foundation for the trashrack structure.
Cover Image
Format:
Image
Looking downstream in outlet conduit from sta. 6+75. The conduit is being covered with 3 feet of loose earth to protect it from freezing. The earth is being placed by the contractor and will be removed in the spring, at his own expense. Refer to Pine R - 97.
Cover Image
Format:
Image
Looking downstream in outlet conduit from station 6+75. Note backfilling operations. Refer to Pine R_ 61, 69, 74, 88, 97, 107, & 124.
Cover Image
Format:
Image
Looking along center-line of cut-off trench toward left abutment, from a point opposite sta. 27+50. The location and angel of view is approximately the same as to Pine R - 32, 39, and 55.
Cover Image
Format:
Image
Looking along left abutment cut-off trench toward right abutment from opposite station 3+00 (Dam axis). Note rock excavation for concrete wall footing in middle foreground and seepage near foot of slope on the right.