Showing 1 - 1 of 1 , query time: 0.01s
Cover Image
Format:
Image
Looking through the arch (under construction) of the Red Cliff Bridge downward to the lower bridge leading into Red Cliff. Railroad tracks visible. Snow on the ground. "Each [arch] rib came in six sections weighing from 17 to 22 tons apiece. The rib sections were hauled by truck from the depot, about a quarter of a mile away, to the highway bridge directly under the high line [of the arch]..." --CHD Bridge Engineer King Burghardt, in Historical...