Looking along left abutment cut-off trench toward right abutment from opposite station 3+00 (Dam axis). Note rock excavation for concrete wall footing in middle foreground and seepage near foot of slope on the right.
Cover Image
Format:
Image
Looking toward left abutment in bottom of cut-off trench from station 9+70. Note sand deposit on each side of trench.
Cover Image
Format:
Image
Placing embankment in cut-off trench at intersection with temporary diversion channel.
Cover Image
Format:
Image
Looking downstream in outlet conduit from sta. 6+25. Completed excavation for trashrack structure in foreground; grout mixer and pump near center; concrete chute at right.
Cover Image
Format:
Image
Looking downstream in outlet conduit from sta. 6+75. Concrete has been placed in the invert of the trashrack and transition.
Cover Image
Format:
Image
Excavation for outlet conduit, looking downstream from station 6+00. Bulldozer in foreground is cleaning off bedrock.
Cover Image
Format:
Image
Rock excavation for trashrack structure. Taken from point on rim to left of structure.
Cover Image
Format:
Image
Looking downstream in outlet conduit from sta. 6+75. Two sections of the arch have been placed. Dragline is placing concrete in invert with bottom dump bucket. See Pine R - 74.
Cover Image
Format:
Image
Looking downstream in outlet conduit from station 6+75. Refer to Pine R - 61, 69, 74, & 88.
Cover Image
Format:
Image
Looking downstream in outlet conduit from station 6+75. Refer to Pine R - 61, 69, 74, & 97
Cover Image
Format:
Image
Le Tourneau loading with aid of a pusher in embankment material being removed for additional cut-off trench.
Cover Image
Format:
Image
Downstream face of cut for additional cut-off trench at station 18+00, showing cross-section of embankment placed during 1938, and the source of each type of material.
Cover Image
Format:
Image
Excavating additional cut-off trench through embankment placed in 1938. Taken from point 25 feet upstream from dam axis at station 17+00.
Cover Image
Format:
Image
Looking at upstream face of cut for additional cut-off trench at sta. 17+50.
Cover Image
Format:
Image
Placing forms for outlet works gate chamber, air shaft, and spiral stairway shaft.
Cover Image
Format:
Image
Inside forms and reinforcement in place for outlet works gate chamber and spiral stairway addition
Cover Image
Format:
Image
Looking downstream in outlet works. Placing inside forms for gate chamber. Hand-tamping embankment over conduit seen in foreground.
Cover Image
Format:
Image
Looking toward left abutment in bottom of cut-off trench from point opposite axis sta. 9+00. Note drainage system at left side of trench has been covered with tar paper preparatory to placing embankment. Grout pipes can be seen extending up the side of the trench for grouting the system.
Cover Image
Format:
Image
Looking toward river channel in bottom of cut-off trench on left abutment, showing foundation drainage installation. Drains will carry water to a corrugated metal pipe sump set in a concrete box. Water is being pumped from temporary sump at extreme left during installation.
Cover Image
Format:
Image
Same view as Pine R - 157 after placing of embankment had started. Note mechanical tamping operations along contact at left side and around pump sump.