Showing 1 - 20 of 31 , query time: 0.01s
Cover Image
Format:
Image
Road to Red Cliff with old bridge across the Eagle River before the Red Cliff Bridge was opened in 1941. Battle Mountain is on the left. Photograph is labeled: "Roads end" [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
"Looking northwest, going down Battle Mt. about 1.5 miles below Gilman." -- Lucille Riggle The Eagle River is at center; U.S. Hwy 24 crosses the river in the foreground.
Cover Image
Format:
Image
Red Cliff bridge.
Cover Image
Format:
Image
Railroad overpass on Colorado Highway 24 leading to Red Cliff. This was the route to Red Cliff prior to the construction of the Red Cliff arch bridge. [Red Cliff Bridge Construction photo 1]
Cover Image
Format:
Image
Looking up at Highway 24 on Battle Mountain from the bridge at the end of Water Street. This was prior to the beginning of construction of the Red Cliff Arch Bridge.
Cover Image
Format:
Image
Looking down on the Red Cliff Bridge as the roadbed is being constructed. Lower road into Red Cliff is visible at lower right. Lover's Leap formation is on the left. [Red Cliff Bridge construction photo 11]
Cover Image
Format:
Image
The iconic Red Cliff Bridge on U.S. Highway 24, across the canyon of the Eagle River at Red Cliff, Colorado. Completed on July 28, 1941; dedicated and opened to travel on August 3, 1941. Dimensions: 470 ft. long; 209 ft. high; 30-ft. roadway and two 18-inch curbs. The Red Cliff Bridge was entered into the National Register of Historic Places on February 4, 1985, in recognition of its contribution to the heritage of the state of Colorado
Cover Image
Format:
Image
A steam shovel is moving earth during the early stages of routing U.S. Highway 24 and the Red Cliff bridge so that they bypassed Red Cliff. The construction involved difficult engineering feats in a harsh climate.
Cover Image
Format:
Image
Looking down the Eagle River and U.S. Highway 24 as it enters Red Cliff on the south. Just to the left of Hwy 24 is the beginning of the approach road to what will be the Red Cliff Arch Bridge.
Cover Image
Format:
Image
The camel-back bridge over the Eagle River on U.S. Hwy 6 & 24, approximately 5-6 miles east of Eagle, Colorado.Behind the train, is the Leonard Horn ranch with ranch houses to the left of the tall pine tree at center. Rube Creek flows by the ranch houses. The dirt road at left goes to the ranch.
Cover Image
Format:
Image
Woman walking away from the camera next to parked cars for the Red Cliff Bridge dedication. The guard rail is made from wooden posts with attached cable. The approach to the bridge on U.S. Highway 24 is part of the six miles of new road constructed during the project. [Red Cliff Bridge construction photo 15]
Cover Image
Format:
Image
Pedestrians gathered on the Red Cliff Bridge, Battle Mountain in the background, for the dedication and grand opening. The dedication was held at noon on Sunday, August 3, 1941. Governor Ralph L. Carr and other officials attended. The bridge and six miles of new highway built over Battle Mountain cost a total of $636,405. The bridge is 470 ft. long, 209 ft. high; the roadbed is 30 ft. wide and has two 18-inch curbs. It is listed on the Historic Bridge...
Cover Image
Format:
Image
Cars lined up along Highway 24 for the Dedication and grand opening of the completed Red Cliff Bridge, August 3, 1941. [Red Cliff Bridge construction photo 13]
Cover Image
Format:
Image
Pedestrians gathered on the Red Cliff Bridge for the dedication and grand opening. The dedication was held at noon on Sunday, August 3, 1941. Governor Ralph L. Carr and other officials attended. The bridge and six miles of new highway built over Battle Mountain cost a total of $636,405. The bridge is 470 ft. long, 209 ft. high; the roadbed is 30 ft. wide and has two 18-inch curbs. It is listed on the Historic Bridge Inventory, Colorado Historical...
Cover Image
Format:
Image
The Red Cliff Bridge taken on October 1, 1995. The arch had been repainted green since its construction in 1941. Lover's Leap rock formation is on the left. The road at the bottom in the alternate access road to Red Cliff.
Cover Image
Format:
Image
Reopening ceremonies after completion of the Red Cliff Bridge rehabilitation in 2004. From left, faciing away from but closest to the camera: Joanna Snyder, Grace Sandoval, Adelina and Serapio Sandoval. Colorado Department of Transportation filmed the event.
Cover Image
Format:
Image
Person sitting in the shovel used to build the approach to the Red Cliff arch bridge. [Red Cliff Bridge construction photo 6]
Cover Image
Format:
Image
Building the approach to the new Red Cliff arch bridge (Highway 24). Digging equipment at far right midfield in the photo. [Red Cliff bridge construction photo 4]
Cover Image
Format:
Image
Roadbed construction on the Red Cliff Bridge, silver in color. Lover's Leap is on the right. [Red Cliff Bridge construction photo 12]
Cover Image
Format:
Image
Road into Red Cliff, prior to the construction of the Red Cliff Bridge on Hwy 24 (prior to 1941).