Showing 81 - 100 of 439 , query time: 0.01s
Cover Image
Format:
Image
Damsite after stripping - Looking along axis of dam toward left abutment from centerline of spillway. (Photographic point No. 1). Double line of stakes seen in foreground are slope stakes for outlet conduit excavation.
Cover Image
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Cover Image
Format:
Image
Looking along axis toward left abutment from centerline of spillway. (Photographic point No. 1). Excavation in foreground is for cut-off trench at right abutment. Large stakes define different sections of the embankment.
Cover Image
Format:
Image
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream.
Cover Image
Format:
Image
View of hand-tamping operations around outlet conduit, taken fro the top of the left bank opposite outlet works station 8+85. Note embankment cut-off wall in left background.
Cover Image
Format:
Image
Close-up of hand-tamping operations in backfilling along the outlet conduit from works station 9+25.
Cover Image
Format:
Image
Placing reinforcement steel in section of outlet conduit.
Cover Image
Format:
Image
Placing concrete in spiral stairway and air shaft from elevation 7641 to 7649.5.
Cover Image
Format:
Image
Dome of gate chamber and base of stair shaft after forms were stripped.
Cover Image
Format:
Image
Looking downstream in spillway channel from sta. 14+25. Excavation in foreground is too subgrade. Water appears to have been trapped by rock ridge seen in Pine R - 149.
Cover Image
Format:
Image
Looking upstream at excavation for spillway stilling basin. Taken from right side of spillway at sta. 30+50.
Cover Image
Format:
Image
Looking upstream at excavation for spillway stilling basin. Taken from right side of spillway at sta. 30+50.
Cover Image
Format:
Image
Looking upstream in spillway channel excavation. Shovel is working in stilling basin.
Cover Image
Format:
Image
Looking downstream in spillway channel from sta. 7+00. Le Tourneau in foreground is excavating material upstream from sta. 15+00. Placing of concrete walls can be seen below station 15+00.
Cover Image
Format:
Image
Placing dumped riprap on right side of spillway outlet channel. Darker colored rock was placed during 1939 season.
Cover Image
Format:
Image
Panorama looking upstream at spillway and river channels from spillway station 30+50. Placing of drains and fine grading for concrete on vertical curve and stilling basin floor can be seen at left.
Cover Image
Format:
Image
Looking upstream at spillway stilling basin from right side of channel at station 30+50. Backfill behind stilling basin walls has been completed. Refer to Pine R - 306
Cover Image
Format:
Image
Looking downstream at spillway stilling basin from left side of channel at sta. 26+30. Placing section of stilling basin wall in foreground. Refer to Pine R - 283.
Cover Image
Format:
Image
Panorama looking upstream at spillway and river channels from spillway station 30+50. Placing of drains and fine grading for concrete on vertical curve and stilling basin floor can be seen at left.
Cover Image
Format:
Image
Looking upstream at spillway from a point approximately 300 ft. downstream from end of structure. Discharge is estimated at 120-second feet.