Showing 1 - 17 of 17 , query time: 0.01s
Cover Image
Format:
Image
c.1930: Crossroads at Wolcott, Colorado: Colorado Hwy 11, U.S. Hwy 24. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
Photo postcard of U.S. Hwy 24 at the top of Tennessee Pass (Alt. 10,240 ft,) between Leadville and Red Cliff, Colorado. [Sanborn W-1181] There is snow on the ground.
Cover Image
Format:
Image
Photo postcard showing the "New Battle Mountain Highway," U.S. Hwy 24. The view is looking south, going from GIlman to Red Cliff.
Cover Image
Format:
Image
Railroad overpass on Colorado Highway 24 leading to Red Cliff. This was the route to Red Cliff prior to the construction of the Red Cliff arch bridge. [Red Cliff Bridge Construction photo 1]
Cover Image
Format:
Image
Looking down on the Red Cliff Bridge as the roadbed is being constructed. Lower road into Red Cliff is visible at lower right. Lover's Leap formation is on the left. [Red Cliff Bridge construction photo 11]
Cover Image
Format:
Image
A steam shovel is moving earth during the early stages of routing U.S. Highway 24 and the Red Cliff bridge so that they bypassed Red Cliff. The construction involved difficult engineering feats in a harsh climate.
Cover Image
Format:
Image
Woman walking away from the camera next to parked cars for the Red Cliff Bridge dedication. The guard rail is made from wooden posts with attached cable. The approach to the bridge on U.S. Highway 24 is part of the six miles of new road constructed during the project. [Red Cliff Bridge construction photo 15]
Cover Image
Format:
Image
Cars lined up along Highway 24 for the Dedication and grand opening of the completed Red Cliff Bridge, August 3, 1941. [Red Cliff Bridge construction photo 13]
Cover Image
Format:
Image
Pedestrians gathered on the Red Cliff Bridge for the dedication and grand opening. The dedication was held at noon on Sunday, August 3, 1941. Governor Ralph L. Carr and other officials attended. The bridge and six miles of new highway built over Battle Mountain cost a total of $636,405. The bridge is 470 ft. long, 209 ft. high; the roadbed is 30 ft. wide and has two 18-inch curbs. It is listed on the Historic Bridge Inventory, Colorado Historical...
Cover Image
Format:
Image
Person sitting in the shovel used to build the approach to the Red Cliff arch bridge. [Red Cliff Bridge construction photo 6]
Cover Image
Format:
Image
Building the approach to the new Red Cliff arch bridge (Highway 24). Digging equipment at far right midfield in the photo. [Red Cliff bridge construction photo 4]
Cover Image
Format:
Image
Roadbed construction on the Red Cliff Bridge, silver in color. Lover's Leap is on the right. [Red Cliff Bridge construction photo 12]
Cover Image
Format:
Image
Road into Red Cliff, prior to the construction of the Red Cliff Bridge on Hwy 24 (prior to 1941).
Cover Image
Format:
Image
Blasting to create a road to the approach to the new Red Cliff arch bridge. Railroad bridge over the Eagle River visible at right foreground. [Red Cliff Bridge construction photo 5]
Cover Image
Format:
Image
Red Cliff Bridge on U.S. Highway 24, across the canyon of the Eagle River at Red Cliff, Colorado. Completed on July 28, 1941; dedicated and opened to travel on August 3, 1941. Dimensions: 470 ft. long; 209 ft. high; 30-ft. roadway and two 18-inch curbs. The Red Cliff Bridge was entered into the National Register of Historic Places on February 4, 1985, in recognition of its contribution to the heritage of the state of Colorado Buildings in background...
Cover Image
Format:
Image
Lover's Leap rock formation as seen from below. Hoist on top of the formation dates it somewhere between 1938 and 1939, just prior to construction of the Red Cliff arch bridge. [Red Cliff Bridge construction photo 3]
Cover Image
Format:
Image
Looking up from the arch girders to the support beams of the roadbed in the Red Cliff Bridge. One man is at a girder at the far right; another is standing on the arch right below the roadbed at left. [Red Cliff Bridge construction photo 10]