Showing 1 - 8 of 8 , query time: 0.01s
Cover Image
Format:
Image
Heavy equipment on a slope of Battle Mountain during road construction (1939-1940). Man and dog are walking in right foreground; graders and tractors moving dirt. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
Looking down on the Red Cliff Bridge as the roadbed is being constructed. Lower road into Red Cliff is visible at lower right. Lover's Leap formation is on the left. [Red Cliff Bridge construction photo 11]
Cover Image
Format:
Image
A steam shovel is moving earth during the early stages of routing U.S. Highway 24 and the Red Cliff bridge so that they bypassed Red Cliff. The construction involved difficult engineering feats in a harsh climate.
Cover Image
Format:
Image
Person sitting in the shovel used to build the approach to the Red Cliff arch bridge. [Red Cliff Bridge construction photo 6]
Cover Image
Format:
Image
Building the approach to the new Red Cliff arch bridge (Highway 24). Digging equipment at far right midfield in the photo. [Red Cliff bridge construction photo 4]
Cover Image
Format:
Image
Roadbed construction on the Red Cliff Bridge, silver in color. Lover's Leap is on the right. [Red Cliff Bridge construction photo 12]
Cover Image
Format:
Image
Blasting to create a road to the approach to the new Red Cliff arch bridge. Railroad bridge over the Eagle River visible at right foreground. [Red Cliff Bridge construction photo 5]
Cover Image
Format:
Image
Looking up from the arch girders to the support beams of the roadbed in the Red Cliff Bridge. One man is at a girder at the far right; another is standing on the arch right below the roadbed at left. [Red Cliff Bridge construction photo 10]