"Homestake dam, some 2nd shift personnel. Left to right: Duane--end dump skinner; Jack Treptow--Shift Supervisor; Chad Bane--Dozer Hand; Kelly Stone Bissell--General Quarry Foreman, Fall of 1966."
Morrison-Knudsen Company, Inc. (MK) was the construction company that did the work under the supervision of Bechtel Corporation, which provided the engineers and construction managers for the project.
Format:
Image
"April 3, 1966, Leadville, Colo. Homestake Dam. M-K Co., Inc. [Morrison-Knudsen]. Coyote Shot, 850,000 cubic yards."
Format:
Image
"Aurora and Colorado Springs are building a huge dam or rock on Homestake Creek southwest of Red Cliff.
The dam will have an upstream impervious face of asphalt laid on a blanket of gravel atop the rock.
There is a concrete curtain extending below the dam foundation into fock formations and into the ountainsides at both ends of the dam.
The asphalt face is technically known as asphaltic concrete, the asphalt being binder instead of cement in what...
Format:
Image
"Red line [midfield, left], estimated shot area; 3,800' of coyote hole explosives in 4 months."
Format:
Image
The completed Homestake Dam and reservoir in 1995.
"Aurora and Colorado Springs are building a huge dam of rock on Homestake Creek southwest of Red Cliff.
The dam will have an upstream impervious face of asphalt laid on a blanket of gravel atop the rock.
There is a concrete curtain extending below the dam foundation into fock formations and into the mountainsides at both ends of the dam.
The asphalt face is technically known as asphaltic concrete,...
Format:
Image
Standing on the dam after the dedication, John P. "Jack" Elliott Dam, Homestake Project, on June 18, 1967. Standees were the Beck children and their grandparents, Joe H. and Johanna Fear.
Format:
Image
Continuing construction of the top level of the Madden Dam. An "x" marks an object in the whitewater formed by the sluice gate. No caption.
The Panama Canal was opened on August 15, 1914. The first major capital improvement was the Madden Dam and Power Project. Completed in 1935, it controlled the flow of water from the Chagres River into Gatun Lake and created its own reservoir, Lake Madden. [That name was changed to Alajuela Lake in 1999 when...
Format:
Image
The construction camp near Hanging Lake in Glenwood Canyon for the Shoshone Dam and Tunnel. Bridge in left background; Colorado River in foreground.
[Title supplied from catalog prepared by the Eagle County Historical Society.]
11) Homestake Dam
Format:
Image
"Aurora and Colorado Springs are building a huge dam or rock on Homestake Creek southwest of Red Cliff.
The dam will have an upstream impervious face of asphalt laid on a blanket of gravel atop the rock.
There is a concrete curtain extending below the dam foundation into fock formations and into the ountainsides at both ends of the dam.
The asphalt face is technically known as asphaltic concrete, the asphalt being binder instead of cement in what...
Format:
Image
"Aurora and Colorado Springs are building a huge dam or rock on Homestake Creek southwest of Red Cliff.
The dam will have an upstream impervious face of asphalt laid on a blanket of gravel atop the rock.
There is a concrete curtain extending below the dam foundation into fock formations and into the ountainsides at both ends of the dam.
The asphalt face is technically known as asphaltic concrete, the asphalt being binder instead of cement in what...
Format:
Image
The Panama Canal was opened on August 15, 1914. The first major capital improvement was the Madden Dam and Power Project. Completed in 1935, it controlled the flow of water from the Chagres River into Gatun Lake and created its own reservoir, Lake Madden. [That name was changed to Alajuela Lake in 1999 when the Canal Zone was returned to Panama.] Hydroelectric power and fresh water for Panama City were also benefits of the project.
Thomas Knight...
Format:
Image
Tom Knight's caption on verso: "From the cement dock level, looking into the canon. Showing the power house and the white water from the sluice gates."
Scaffolding visible on the dam face, with men working on it.
The Panama Canal was opened on August 15, 1914. The first major capital improvement was the Madden Dam and Power Project. Completed in 1935, it controlled the flow of water from the Chagres River into Gatun Lake and created its own reservoir,...
Format:
Image
"Homestake Dam. The material from the last Coyote-hole blast is about cleaned up. The shovels are working on the far end of the blast zone. The lower quarry bench and ramp is now covered with water. The upper two benches have been dug out by working from 2 headings on each level and now are used as the haul roads for the far end. Aug. 1966."
Format:
Image
"Aurora and Colorado Springs are building a huge dam of rock on Homestake Creek southwest of Red Cliff.
The dam will have an upstream impervious face of asphalt laid on a blanket of gravel atop the rock.
There is a concrete curtain extending below the dam foundation into fock formations and into the mountainsides at both ends of the dam.
The asphalt face is technically known as asphaltic concrete, the asphalt being binder instead of cement in what...
Format:
Image
"Paving Homestake Dam, October 1966. 1055 PH crane outfitted to perform more than one operation."
Format:
Image
Dedication of the John P. "Jack" Elliott Dam, Homestake Project, on June 18, 1967. Speakers were from Aurora and Colorado Springs.
Format:
Image
Photo postcard of the bachelor quarters in the Canal Zone for workers on the Madden Dam.
Format:
Image
"Homestake Dam first coyote-hole blast to open the quarry for the dam's rock fill material; consumed 13 ton of explosives."