Showing 1 - 12 of 12 , query time: 0.01s
Cover Image
Format:
Image
Photo postcard, hand colored, 15799: Looking down the Colorado River at Burns, Colo., on the Dotsero Cutoff. Caption on verso: "'The Pagodas' in Red Canon, Colorado River. The Dotsero Cutoff, 38.1 miles long, is the Denver & Rio Grande Western Railroad's latest construction, connecting Dotsero, 17 miles east of Glenwood Springs, with Orestod, on the Moffat Road. This reduces the distance 175 miles from Denver to Glenwood Springs, Salt Lake City...
Cover Image
Format:
Image
Blasting overhanging rock during road construction in Glenwood Canyon (1936-1937). Snow on canyon sides. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
First bridge over the Colorado River (then the Grand River) at Dotsero. The bridge was probably built by Mr. Yost or Mr. Stewart. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
Old State Bridge structure in July of 1983, taken from State Highway 131 (south of the bridge). The southern half of the bridge collapsed soon after this photo was taken. The State Bridge Lodge is in the background.
Cover Image
Format:
Image
Blasting rock during the construction of highway through Glenwood Canyon. The Colorado River is at the right; there is snow on the hills in the background. Large rocks in foreground with debris from the blast rising in the air in center midground. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
Blasting in Glenwood Canyon during road construction, 1936-37. Snow present on canyon sides. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
Construction of the Hanging Lake rest area in Glenwood Canyon, part of the I-70 construction project. This photo was taken on June 27, 1994. The project completed Interstate 70's final, 12.5-mile gap in the transcontinental highway reaching from Baltimore, Maryland, to Interstate 15 south of Salt Lake City. "Lawsuits, environmental impact studies, and design changes took nearly two decades to resolve before the first shovelful of earth was turned...
Cover Image
Format:
Image
Road Construction in Glenwood Canyon, 1936-1937. C. A. Switzer involved in the construction (Denver bridge builder who built the Dotsero and Eagle Bridges). Man in crane bucket with vehicles parked around the crane. Woman in midground. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
The east entrance to Glenwood Canyon in the 1930s. The road was not paved and was very close to the Colorado River which carved the canyon. The road connects Dotsero and Eagle County to Glenwood Springs and Garfield County, Colorado. [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
Photo postcard, handcolored, 15797: Bridge over the Colorado River on the Dotsero Cutoff. Caption on Verso: "'The Pagodas' in Red Canon, Colorado River. The Dotsero Cutoff, 38.1 miles long, is the Denver & Rio Grande Western Railroad's latest construction, connecting Dotsero, 17 miles east of Glenwood Springs, with Orestod, on the Moffat Road. This reduces the distance 175 miles from Denver to Glenwood Springs, Salt Lake City and beyond. Ceremonies...
Cover Image
Format:
Image
Bridge over the Colorado River at Blue Hill, Burns, Colorado. Grand River (Colorado) Hill Road visible at right. Bearden's General Store was built after this photo was taken (it will be behind the bridge). [Title supplied from catalog prepared by the Eagle County Historical Society.]
Cover Image
Format:
Image
Colorado River at Burns, Colorado